Instagram Logo

baylisandy

Andy Baylis

Sustainable Structural Engineer. Sustainability Consultant. Worcester UK.

216
posts
332
followers
309
following

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago


Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago


Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago

Our current project in Hampton Lovett.

A lush green start followed by a 600 ton excavation to make way for the construction of a workshop / office.

A 30m x 2m high Gabion basket retaining wall will hold back the earth to form the new hard standing area where the building will be constructed.

An Archeologist was present on site which was interesting - there was thought to be a roman settlement in this area but unfortunately we didn't find anything cool. In places there's a meter deep of good draining top soil before we hit the red mercia mudstone.

Getting into the construction of the gabion wall this week, then moving on to foundations for the build.

There is talk of swapping the staircase for a bridge to the top of the gabion wall. Definitely should be a drawbridge. At this point we might as well build a moat.

Fun project - lots of dirt.

Architectural concept - @randall_architectural
Structural design - @baylisandy
Excavator - @whc_hire_services


21
3
2 days ago


A week of battening for the Jengo Studio - next week windows and electrical first fix!


18
1
1 weeks ago

A week of battening for the Jengo Studio - next week windows and electrical first fix!


18
1
1 weeks ago

A week of battening for the Jengo Studio - next week windows and electrical first fix!


18
1
1 weeks ago

A week of battening for the Jengo Studio - next week windows and electrical first fix!


18
1
1 weeks ago

A week of battening for the Jengo Studio - next week windows and electrical first fix!


18
1
1 weeks ago

A week of battening for the Jengo Studio - next week windows and electrical first fix!


18
1
1 weeks ago


A week of battening for the Jengo Studio - next week windows and electrical first fix!


18
1
1 weeks ago

A week of battening for the Jengo Studio - next week windows and electrical first fix!


18
1
1 weeks ago

A week of battening for the Jengo Studio - next week windows and electrical first fix!


18
1
1 weeks ago

A week of battening for the Jengo Studio - next week windows and electrical first fix!


18
1
1 weeks ago

Jengo Studio March and April - a mixture of activities, prepping clay, plumbing first fix, service penetrations, air tightness membrane, and making battens from the reclaimed timber


17
2 weeks ago

Jengo Studio March and April - a mixture of activities, prepping clay, plumbing first fix, service penetrations, air tightness membrane, and making battens from the reclaimed timber


17
2 weeks ago

Jengo Studio March and April - a mixture of activities, prepping clay, plumbing first fix, service penetrations, air tightness membrane, and making battens from the reclaimed timber


17
2 weeks ago

Jengo Studio March and April - a mixture of activities, prepping clay, plumbing first fix, service penetrations, air tightness membrane, and making battens from the reclaimed timber


17
2 weeks ago

Jengo Studio March and April - a mixture of activities, prepping clay, plumbing first fix, service penetrations, air tightness membrane, and making battens from the reclaimed timber


17
2 weeks ago

Jengo Studio March and April - a mixture of activities, prepping clay, plumbing first fix, service penetrations, air tightness membrane, and making battens from the reclaimed timber


17
2 weeks ago

Jengo Studio March and April - a mixture of activities, prepping clay, plumbing first fix, service penetrations, air tightness membrane, and making battens from the reclaimed timber


17
2 weeks ago

Jengo Studio March and April - a mixture of activities, prepping clay, plumbing first fix, service penetrations, air tightness membrane, and making battens from the reclaimed timber


17
2 weeks ago

Jengo Studio March and April - a mixture of activities, prepping clay, plumbing first fix, service penetrations, air tightness membrane, and making battens from the reclaimed timber


17
2 weeks ago

Jengo Studio Week 8 - floor insulation, boarding and stud partitions installed.With thanks to Shelley Building giving the project such a boost for the last two months.


11
2 months ago

Jengo Studio Week 8 - floor insulation, boarding and stud partitions installed.With thanks to Shelley Building giving the project such a boost for the last two months.


11
2 months ago

Jengo Studio Week 8 - floor insulation, boarding and stud partitions installed.With thanks to Shelley Building giving the project such a boost for the last two months.


11
2 months ago

Jengo Studio Week 8 - floor insulation, boarding and stud partitions installed.With thanks to Shelley Building giving the project such a boost for the last two months.


11
2 months ago

Jengo Studio Week 8 - floor insulation, boarding and stud partitions installed.With thanks to Shelley Building giving the project such a boost for the last two months.


11
2 months ago

Jengo Studio Week 8 - floor insulation, boarding and stud partitions installed.With thanks to Shelley Building giving the project such a boost for the last two months.


11
2 months ago

Jengo Studio Week 8 - floor insulation, boarding and stud partitions installed.With thanks to Shelley Building giving the project such a boost for the last two months.


11
2 months ago

10
2 months ago

10
2 months ago

10
2 months ago

10
2 months ago

10
2 months ago

10
2 months ago

10
2 months ago

10
2 months ago

10
2 months ago

10
2 months ago

10
2 months ago

10
2 months ago

A busy week 6 on the Jengo Studio, lots of roof woodfibre being fitted with complex shapes thanks to the table saw and Henry is not happy!The roof light is in and looking great, and how not to fit a piece of woodfibre with one hand while holding a phone… 😵‍💫


13
1
3 months ago

A busy week 6 on the Jengo Studio, lots of roof woodfibre being fitted with complex shapes thanks to the table saw and Henry is not happy!The roof light is in and looking great, and how not to fit a piece of woodfibre with one hand while holding a phone… 😵‍💫


13
1
3 months ago

A busy week 6 on the Jengo Studio, lots of roof woodfibre being fitted with complex shapes thanks to the table saw and Henry is not happy!The roof light is in and looking great, and how not to fit a piece of woodfibre with one hand while holding a phone… 😵‍💫


13
1
3 months ago

A busy week 6 on the Jengo Studio, lots of roof woodfibre being fitted with complex shapes thanks to the table saw and Henry is not happy!The roof light is in and looking great, and how not to fit a piece of woodfibre with one hand while holding a phone… 😵‍💫


13
1
3 months ago

A busy week 6 on the Jengo Studio, lots of roof woodfibre being fitted with complex shapes thanks to the table saw and Henry is not happy!The roof light is in and looking great, and how not to fit a piece of woodfibre with one hand while holding a phone… 😵‍💫


13
1
3 months ago

A busy week 6 on the Jengo Studio, lots of roof woodfibre being fitted with complex shapes thanks to the table saw and Henry is not happy!The roof light is in and looking great, and how not to fit a piece of woodfibre with one hand while holding a phone… 😵‍💫


13
1
3 months ago

A busy week 6 on the Jengo Studio, lots of roof woodfibre being fitted with complex shapes thanks to the table saw and Henry is not happy!The roof light is in and looking great, and how not to fit a piece of woodfibre with one hand while holding a phone… 😵‍💫


13
1
3 months ago

A busy week 6 on the Jengo Studio, lots of roof woodfibre being fitted with complex shapes thanks to the table saw and Henry is not happy!The roof light is in and looking great, and how not to fit a piece of woodfibre with one hand while holding a phone… 😵‍💫


13
1
3 months ago

A busy week 6 on the Jengo Studio, lots of roof woodfibre being fitted with complex shapes thanks to the table saw and Henry is not happy!The roof light is in and looking great, and how not to fit a piece of woodfibre with one hand while holding a phone… 😵‍💫


13
1
3 months ago

A busy week 6 on the Jengo Studio, lots of roof woodfibre being fitted with complex shapes thanks to the table saw and Henry is not happy!The roof light is in and looking great, and how not to fit a piece of woodfibre with one hand while holding a phone… 😵‍💫


13
1
3 months ago

A busy week 6 on the Jengo Studio, lots of roof woodfibre being fitted with complex shapes thanks to the table saw and Henry is not happy!The roof light is in and looking great, and how not to fit a piece of woodfibre with one hand while holding a phone… 😵‍💫


13
1
3 months ago

Jengo Studio week 5 - a bit slower this week but wall woodfibre is now done plus some more externals.Big week next week (weather dependent…..)


16
2
3 months ago

Jengo Studio week 5 - a bit slower this week but wall woodfibre is now done plus some more externals.Big week next week (weather dependent…..)


16
2
3 months ago

Jengo Studio week 5 - a bit slower this week but wall woodfibre is now done plus some more externals.Big week next week (weather dependent…..)


16
2
3 months ago

Jengo Studio week 5 - a bit slower this week but wall woodfibre is now done plus some more externals.Big week next week (weather dependent…..)


16
2
3 months ago

Jengo Studio week 5 - a bit slower this week but wall woodfibre is now done plus some more externals.Big week next week (weather dependent…..)


16
2
3 months ago

Jengo Studio week 5 - a bit slower this week but wall woodfibre is now done plus some more externals.Big week next week (weather dependent…..)


16
2
3 months ago

Jengo Studio week 5 - a bit slower this week but wall woodfibre is now done plus some more externals.Big week next week (weather dependent…..)


16
2
3 months ago

Jengo Studio week 5 - a bit slower this week but wall woodfibre is now done plus some more externals.Big week next week (weather dependent…..)


16
2
3 months ago

Jengo is now a corporate sponsor! ….of the Nunnery Wood squash team! 🤣


5
3 months ago

Jengo is now a corporate sponsor! ….of the Nunnery Wood squash team! 🤣


5
3 months ago

Jengo is now a corporate sponsor! ….of the Nunnery Wood squash team! 🤣


5
3 months ago

Jengo is now a corporate sponsor! ….of the Nunnery Wood squash team! 🤣


5
3 months ago

Jengo is now a corporate sponsor! ….of the Nunnery Wood squash team! 🤣


5
3 months ago

Jengo is now a corporate sponsor! ….of the Nunnery Wood squash team! 🤣


5
3 months ago

Jengo is now a corporate sponsor! ….of the Nunnery Wood squash team! 🤣


5
3 months ago

Jengo is now a corporate sponsor! ….of the Nunnery Wood squash team! 🤣


5
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

Week 4 Jengo Studio very frustrating involved a lot of digging to resolve drainage and blocked service ducts and laying of new gravel on the drive.But Charlie’s beautiful reclaimed brick path is a thing of joy 🤩


16
3 months ago

End of week 3 of the Jengo Studio.Clay plaster levelling coat nearly all on, wood fibre started, reclaimed timber prepped and screws/nails recycled, floor, door and threshold preparation progressed - electrician lined up


15
3 months ago

End of week 3 of the Jengo Studio.Clay plaster levelling coat nearly all on, wood fibre started, reclaimed timber prepped and screws/nails recycled, floor, door and threshold preparation progressed - electrician lined up


15
3 months ago

End of week 3 of the Jengo Studio.Clay plaster levelling coat nearly all on, wood fibre started, reclaimed timber prepped and screws/nails recycled, floor, door and threshold preparation progressed - electrician lined up


15
3 months ago

End of week 3 of the Jengo Studio.Clay plaster levelling coat nearly all on, wood fibre started, reclaimed timber prepped and screws/nails recycled, floor, door and threshold preparation progressed - electrician lined up


15
3 months ago

End of week 3 of the Jengo Studio.Clay plaster levelling coat nearly all on, wood fibre started, reclaimed timber prepped and screws/nails recycled, floor, door and threshold preparation progressed - electrician lined up


15
3 months ago

End of week 3 of the Jengo Studio.Clay plaster levelling coat nearly all on, wood fibre started, reclaimed timber prepped and screws/nails recycled, floor, door and threshold preparation progressed - electrician lined up


15
3 months ago

End of week 3 of the Jengo Studio.Clay plaster levelling coat nearly all on, wood fibre started, reclaimed timber prepped and screws/nails recycled, floor, door and threshold preparation progressed - electrician lined up


15
3 months ago

End of week 3 of the Jengo Studio.Clay plaster levelling coat nearly all on, wood fibre started, reclaimed timber prepped and screws/nails recycled, floor, door and threshold preparation progressed - electrician lined up


15
3 months ago

Jengo Studio end of week 2 (with help from Shelley Builders) - mezzanine joists in, Back to Earth insulation system on site, below ground drains in, walls being prepped.


8
4 months ago

Jengo Studio end of week 2 (with help from Shelley Builders) - mezzanine joists in, Back to Earth insulation system on site, below ground drains in, walls being prepped.


8
4 months ago

Jengo Studio end of week 2 (with help from Shelley Builders) - mezzanine joists in, Back to Earth insulation system on site, below ground drains in, walls being prepped.


8
4 months ago

Jengo Studio end of week 2 (with help from Shelley Builders) - mezzanine joists in, Back to Earth insulation system on site, below ground drains in, walls being prepped.


8
4 months ago

Resolving to visit the wonderful projects I have been designing over the past five years - lovely to see Llama Croft and Hill Croft looking beautiful and taking their finished shape - thank you to Bert and Janna for the tours!


15
1
4 months ago

Resolving to visit the wonderful projects I have been designing over the past five years - lovely to see Llama Croft and Hill Croft looking beautiful and taking their finished shape - thank you to Bert and Janna for the tours!


15
1
4 months ago

Resolving to visit the wonderful projects I have been designing over the past five years - lovely to see Llama Croft and Hill Croft looking beautiful and taking their finished shape - thank you to Bert and Janna for the tours!


15
1
4 months ago

Resolving to visit the wonderful projects I have been designing over the past five years - lovely to see Llama Croft and Hill Croft looking beautiful and taking their finished shape - thank you to Bert and Janna for the tours!


15
1
4 months ago

Resolving to visit the wonderful projects I have been designing over the past five years - lovely to see Llama Croft and Hill Croft looking beautiful and taking their finished shape - thank you to Bert and Janna for the tours!


15
1
4 months ago

Resolving to visit the wonderful projects I have been designing over the past five years - lovely to see Llama Croft and Hill Croft looking beautiful and taking their finished shape - thank you to Bert and Janna for the tours!


15
1
4 months ago

Resolving to visit the wonderful projects I have been designing over the past five years - lovely to see Llama Croft and Hill Croft looking beautiful and taking their finished shape - thank you to Bert and Janna for the tours!


15
1
4 months ago

Resolving to visit the wonderful projects I have been designing over the past five years - lovely to see Llama Croft and Hill Croft looking beautiful and taking their finished shape - thank you to Bert and Janna for the tours!


15
1
4 months ago

Resolving to visit the wonderful projects I have been designing over the past five years - lovely to see Llama Croft and Hill Croft looking beautiful and taking their finished shape - thank you to Bert and Janna for the tours!


15
1
4 months ago

Resolving to visit the wonderful projects I have been designing over the past five years - lovely to see Llama Croft and Hill Croft looking beautiful and taking their finished shape - thank you to Bert and Janna for the tours!


15
1
4 months ago


Story Save - Best free tool for saving Stories, Reels, Photos, Videos, Highlights, IGTV to your phone.

Story-save.com is an intuitive online tool that enables users to download and save a variety of content, including stories, photos, videos, and IGTV materials, directly from Instagram. With Story-Save, you can not only easily download diverse content from Instagram but also view it at your convenience, even without internet access. This tool is perfect for those moments when you come across something interesting on Instagram and want to save it for later viewing. Use Story-Save to ensure you don't miss the chance to take your favorite Instagram moments with you!

Our advantages:

No Need to Register

Avoid app downloads and sign-ups, store stories on the web.

Exclusive High-Quality

Stories Say goodbye to poor-quality content, preserve only high-resolution Stories.

Accessible on All

Devices Download Instagram Stories using any browser, iPhone, Android.

Completely Free to Use

Absolutely no fees. Download any Story at no cost.

Frequently Asked Questions

The Instagram Stories Download feature is designed to provide a secure and high-quality method for downloading Instagram stories. It's user-friendly and doesn't require users to register or sign up. Simply copy the link, paste it, and enjoy the content.
Downloading Instagram stories is a simple process that involves three steps:
  • 1. Go to the Instagram Story Downloader tool.
  • 2. Next, type the username of the Instagram profile into the provided field and click on the Download button.
  • 3. You'll then see all the Stories that are available for the current 24-hour period. Select the ones you want and hit Download.
The selected story will be swiftly saved to your device's local storage.
Unfortunately, it is not possible to download stories from private accounts due to privacy restrictions.
There is no limit to the number of times you can use the Instagram story download service. It's available for unlimited use and is completely free.
Yes, it is legal to download and save Instagram Stories from other users, provided they are not used for commercial purposes. If you intend to use them commercially, you must obtain permission from the original content owner and credit them each time the story is used.
All downloaded stories are typically saved in the Downloads folder on your computer, whether you're using Windows, Mac, or iOS. For mobile devices, the stories are saved in the phone's storage and should also appear in your Gallery app immediately after download.